Hi...
My name is Hector and I've waited some months to begin, but starting has become a necesity...so with good luck and the help of this great community other mechmate will be running an cutting in the near future.

Last may I bought the laser cut parts from Joe, and this weekend I bough a Lincoln Weld Pak 180HD from home depot with other stuff needed, so I'm ready to order steel and start building the Table.

Before ordering I have a big issue concerning me... to go for a 5'x10' table or a 4'x8' (actually 49"x97"), could someone give me a good reason to go bigger, mostly the bigger boards youll get here are 49"x97" why should I go bigger? Something that I might be missing in my thoughts?

I have selected the steel profiles that I can find here, and made some drawings of a 47"x97 table, could some one review them and tell me if they are ok...some things missing still in the drawings but mostly is done.

Kindest Regards,
Hector

Superceded drawing deleted
Reply With Quote
  #2  
Old Wed 26 November 2008, 12:19
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
If your boards are 49"x97", then build it for 49"x97"

A rough check of your drawing looked good.
Reply With Quote
  #3  
Old Wed 26 November 2008, 18:27
Conrado_Navarro
Just call me: CONRADO NAVARRO #55
 
OBREGON
Mexico
Send a message via MSN to Conrado_Navarro Send a message via Yahoo to Conrado_Navarro
Hector :
I will go as big as the desing let me, In the building busines I find a lot of uses for a big MM,
In main axis the chanel profile is 6 mts, so I have 3 mts long (2 pieces) and for the second axis I have 2.50 mts
Reply With Quote
  #4  
Old Thu 27 November 2008, 10:18
robertmonroe
Just call me: Robert
 
El Paso
United States of America
Hector,

Go for the larger table! You will be happy when you need that extra room for a holding fixture or something.

I live in El Paso, Texas. What part of Mexico do you live?

Robert.
Reply With Quote
  #5  
Old Thu 27 November 2008, 11:46
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
Not so fast on the bigger table!

If you do not have a vacuum holddown table, it is a pain to hold boards that are smaller than the table. Then you cannot just put a few clamps around the edges.
Reply With Quote
  #6  
Old Thu 27 November 2008, 12:28
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Quote:
Originally Posted by robertmonroe View Post
Hector,

Go for the larger table! You will be happy when you need that extra room for a holding fixture or something.

I live in El Paso, Texas. What part of Mexico do you live?

Robert.

Hi Robert,
I live in Monterrey, 2:30 hours drive from Laredo Texas...
Reply With Quote
  #7  
Old Thu 27 November 2008, 12:30
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Quote:
Originally Posted by Gerald D View Post
Not so fast on the bigger table!

If you do not have a vacuum holddown table, it is a pain to hold boards that are smaller than the table. Then you cannot just put a few clamps around the edges.
Gerald,
Could you pin point me to a thread or someone that has build a vacuum holddown table for the mechmate, Already spending on the table it might be good idea to incorporate it in the build.
Thanks...
Hector
Reply With Quote
  #8  
Old Thu 27 November 2008, 12:50
domino11
Just call me: Heath
 
Cornwall, Ontario
Canada
JRs Table has a vacuum hold down system

http://www.mechmate.com/forums/showthread.php?t=329
Reply With Quote
  #9  
Old Thu 27 November 2008, 22:59
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Thanks for the link....
Reply With Quote
  #10  
Old Fri 28 November 2008, 18:40
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Final Mechmate 49"x97" Table Plans...

This is the finished plan of my 49"x97" table...Havent find a real justification to go bigger. The profiles used for the table are:

QTY. DESCRIPTION COST SUBTOTAL
1 CHANNEL 8" 17.11 KG/M 6.10 MT. $2,046.77 $2,046.77 mx
6 CHANNEL 3" 6.10 KG/M 6.10 MT. $688.45 $4,130.70 mx
2 ANGLE 2 1/2" X 2 1/2" X 1/4" 6.10 MT $670.00 $1,340.00 mx
$7,517.47 mx
Mexican Pesos per US Dll. $13.80
Total $544.74 dlls.
I Though I will spend less for the steel, but I can see is expensive right now

If some one has comments or corrections on my plan please correct me any help is really appreciated!!!
Kindest Regards,
Hector

Last edited by kanankeban; Fri 28 November 2008 at 18:54..
Reply With Quote
  #11  
Old Fri 28 November 2008, 20:34
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
6 CHANNEL 3" - shouldn't that be 7 to get 6 spaces of 400mm?

2 ANGLE 2 1/2" X 2 1/2" X 1/4" - this is a problem to cut with the grinder because it is too high. Try to get 2 1/2" X 1 1/2" X 1/4"
Reply With Quote
  #12  
Old Fri 28 November 2008, 21:20
bradm
Just call me: Brad #10
 
Somerville(MA)
United States of America
Actually, I think he has (6) 6.1 meter (20ft) pieces of 3" channel.

So presumably that's for legs and cross braces, as well as for the table bed support.

Hector, you've decided to not use round tube for your cross braces?
Reply With Quote
  #13  
Old Fri 28 November 2008, 22:39
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
The bottom bracing can happily be 3" channel iron from a strength viewpoint. The table will then loose some torsional stiffness, but that doesn't matter if all 4 legs stand on a firm floor. The diagonal braces can be reduced as low as 1.5 x 1.5 x .1875 angle iron without problems - unless you bump them from the side with a heavy board.
Reply With Quote
  #14  
Old Sat 29 November 2008, 00:21
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Quote:
Originally Posted by Gerald D View Post
6 CHANNEL 3" - shouldn't that be 7 to get 6 spaces of 400mm?

2 ANGLE 2 1/2" X 2 1/2" X 1/4" - this is a problem to cut with the grinder because it is too high. Try to get 2 1/2" X 1 1/2" X 1/4"
Hi Gerald,
I have some problems with the quota, I couldnt attach the updated drawing, could you help me with that, I just have something like 1mg.
With the 6 3" channels, thats correct Im getting 7 cross bearers 400.97mm [15 3/16"] apart to centers.
I´ll try to get that 2 1/2"x 1 1/2" x 1/4" angle, I havent seen that one on the catalogs around here...
Thanks again...
Reply With Quote
  #15  
Old Sat 29 November 2008, 00:24
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Quote:
Originally Posted by bradm View Post
Actually, I think he has (6) 6.1 meter (20ft) pieces of 3" channel.

So presumably that's for legs and cross braces, as well as for the table bed support.

Hector, you've decided to not use round tube for your cross braces?
Hi Brad,
You are so correct..., yes Im going to use same 3" channel for almost every part of the table, unless I find something cheaper and that can give the same stiffness in the table structure.
Regards,
Hector

Last edited by kanankeban; Sat 29 November 2008 at 00:34..
Reply With Quote
  #16  
Old Sat 29 November 2008, 01:37
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
Hector, I have increased your quota, but please reduce your file sizes. (Or save the files on another service)

Must I delete that first drawing (big pdf file) for you?
Reply With Quote
  #17  
Old Sat 29 November 2008, 07:18
bradm
Just call me: Brad #10
 
Somerville(MA)
United States of America
I was also unable to find 2-1/2" x 1-1/2" Angle, and purchased 2-1/2" x 2" angle, and cut it down. The resulting excess strip is perfect for the inside of the gantry tubes (that's on a drawing somewhere, but I don't have the drawings to hand at the moment). You'll see quite a bit of discussion and pictures on the cutting process elsewhere on the forum.
Reply With Quote
  #18  
Old Sat 29 November 2008, 07:53
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
Post moved to:
http://www.mechmate.com/forums/showthread.php?t=1168
Reply With Quote
  #19  
Old Thu 04 December 2008, 18:19
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Day 1

Hi,
I just dedicated my first 5 hours of building time, this hours were spend rough cutting all pieces of the table. I also bough the 2"x4" profile for the y axis, so im almost ready to order v wheels. Next round will be spend doing precison cuts to the profiles, grinding and preparing all pieces to start welding.
Attached Images
File Type: jpg Dec04_0001.jpg (26.2 KB, 1912 views)
File Type: jpg Dec04_0002.jpg (29.0 KB, 1914 views)
File Type: jpg Dec04_0003.jpg (26.9 KB, 1906 views)
Reply With Quote
  #20  
Old Thu 04 December 2008, 19:22
robertmonroe
Just call me: Robert
 
El Paso
United States of America
Horale!! Muy bueno, me da envidia.
Reply With Quote
  #21  
Old Tue 23 December 2008, 20:44
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Day 2 of my build

Hi...
This was day 2 of my build, 7 hours between preparing everything and build time. I started detailing the ends of the x beams, making sure they where identical, did some grinding preparing them for the end plates. I tag welded the end plates with 3 welds from the interior of the beam, then I welded from the outside top an bottom, leaving the side without weld (paint should cover that small gap) after that, I grinded the ends until round. After that I presented both beams and marked and drilled pilot holes for the cross bearers with a wood jig I builded from scrap wood.
Hope I have some free hours to work soon...
Happy Holidays!!! Merry Christmas to every member of this woderfull community
Hector
Attached Images
File Type: jpg Dec23_0002.jpg (27.1 KB, 1850 views)
File Type: jpg Dec23_0001.jpg (37.7 KB, 1850 views)
File Type: jpg Dec23_0005.jpg (39.7 KB, 1837 views)
File Type: jpg Dec23_0004.jpg (31.5 KB, 1829 views)
File Type: jpg Dec23_0006.jpg (34.1 KB, 1825 views)
File Type: jpg Dec23_0008.jpg (34.5 KB, 1820 views)

Last edited by kanankeban; Tue 23 December 2008 at 20:53..
Reply With Quote
  #22  
Old Tue 23 December 2008, 21:10
Adan
Just call me: ADAN
 
OBREGON
Mexico
Hola Hector:
Muy buen trabajo, de hecho es mucho mejor que el mio, aunque no he posteado fotos, ya termine soldaduras y pintura.
Solo espero comprar los electronicos.
Saludos y felicidades
Reply With Quote
  #23  
Old Tue 23 December 2008, 21:11
Adan
Just call me: ADAN
 
OBREGON
Mexico
por cierto Adan es el nombre de mi padre, (Soy Conrado)
y abri esta cuenta para consultas desde Casa
Reply With Quote
  #24  
Old Tue 23 December 2008, 22:14
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
Good solid work and some clever marking out, Hector

May you and your family also have a very blessed Xmas and happy holidays.
Reply With Quote
  #25  
Old Sat 27 December 2008, 19:23
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Day 3 of my build

Yesturday I had some hours left, 3 to 4 hours. I went with a friend and asked him to cut a spare channel that was left, the purpose was to have some material to cut some bevel washers for the cross bearers. The longs turned to be 1-1/4" aprox. so I cutted 42 pieaces,they turned to be 1-1/4" squares. After that I grind them to take out sharp edges.
Attached Images
File Type: jpg Dec26_0002.jpg (37.2 KB, 1765 views)
File Type: jpg Dec26_0003.jpg (44.3 KB, 1757 views)
File Type: jpg Dec26_0004.jpg (25.2 KB, 1751 views)
Reply With Quote
  #26  
Old Sun 28 December 2008, 01:41
sailfl
Just call me: Nils #12
 
Winter Park, FL
United States of America
Nice work!
Reply With Quote
  #27  
Old Sun 28 December 2008, 13:33
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Day 4 of my build

Yesturday I invested around 5 hours preparing the cross bearers. The first thing was cutting and grinding to exact size and presenting the channels as they will be placed on the table, then with a wood jig i made from scrap I mark the 60 degree cuts, and procede to cut them. After the channles were ready I present them another time and made marks where the bevel washers should go. I thought it was better to weld the bevel washers and tap them in place to use them as nuts instead of the bolt and nut configuration in the plans, this way when fixing the sacrificial board ill just need to access the top to tight the board in place
Attached Images
File Type: jpg Dec27_0002.jpg (30.6 KB, 1742 views)
File Type: jpg Dec27_0003.jpg (34.6 KB, 1745 views)
File Type: jpg Dec27_0005.jpg (34.9 KB, 1741 views)
File Type: jpg Dec27_0012.jpg (41.9 KB, 1737 views)

Last edited by kanankeban; Sun 28 December 2008 at 13:37..
Reply With Quote
  #28  
Old Sun 28 December 2008, 21:46
Kobus_Joubert
Just call me: Kobus #6
 
Riversdale Western Cape
South Africa
Send a message via Yahoo to Kobus_Joubert Send a message via Skype™ to Kobus_Joubert
Nice going....did you weld the bevel washers? Mine are loose like a normal washer. This is a idea...dril and tap into this home made bevel...no problem fixing the table top. It becomes a one man job.
Reply With Quote
  #29  
Old Sun 28 December 2008, 22:04
kanankeban
Just call me: Hector #89
 
Monterrey
Mexico
Quote:
Originally Posted by Kobus_Joubert View Post
Nice going....did you weld the bevel washers? Mine are loose like a normal washer. This is a idea...dril and tap into this home made bevel...no problem fixing the table top. It becomes a one man job.
Hi Kobus,
Yes I welded the washers, as I mention in my last post thats the idea, instead of needing two hands one in the top and a friend going beneath the table to secure the nut, taping the bevel washers will solve this issue

Last edited by kanankeban; Sun 28 December 2008 at 22:08..
Reply With Quote
  #30  
Old Sun 28 December 2008, 23:07
Gerald D
Just call me: Gerald (retired)
 
Cape Town
South Africa
If you drill and tap into the channels for the table top, you do not need taper washers - the channel is thick enough.

Also, if you weld too much, those cross-support channels will bend down and twist.

We find that these screws come loose with time. It is not the nut that turns loose, but the wood which is settling. That is why we epoxy the big head of the bolt and tighten with nuts from the bottom.
Reply With Quote
Reply

Register Options Profile Last 1 | 3 | 7 Days Search Today's Posts Mark Forums Read

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Mexico's 1st Mechmate Finally is cutting #55 - Obregon, Mexico Conrado_Navarro MechMates already cutting 128 Mon 18 November 2013 12:38
It Cuts the Wood and Aluminum #76 - Guadalajara, Mexico rceja MechMates already cutting 85 Sun 17 November 2013 06:26
3D Elk cutting (video) #13 - Hagerman, New Mexico Greg J MechMates already cutting 415 Sat 05 September 2009 20:28
Upgrading the vBulletin software that runs this forum Gerald D Archives 54 Mon 20 July 2009 03:26
Runs out of steam? Machine freezes during cutting - controlling PC's performance liaoh75 Troubleshooting 11 Thu 23 October 2008 22:34


All times are GMT -6. The time now is 14:33.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.