jehayes Sat 15 August 2009 21:10

Rail grinding process question
 
I have 2-1/2 by 2" angle iron stock. When cutting it down to the 1.1" required for the finished rail what is the correct process? Should I cut it first horizontally before cutting the angles on it? Or should I just grind the angles until I reach the final height? If I cut it first horizontally, to what height before starting to grind the angles? Or should I just go right to 1.1"? (I have seen all the photos and videos of folks cutting the angles horizontally first but haven't seen anything about the intermediate height, if any.) Thanks :confused:

bfauska Sat 15 August 2009 23:03

The first cut should be to 1.1" and then after you grind the angles you should have a small flat on top that is actually left over from your original cut. If you have the laser cut parts with the grinder skate there is a way to use it to make the horizontal cut, but I had access to a steel cutting circular saw and did that instead. I actually think the finished cut is cleaner with the grinder.

jehayes Sun 16 August 2009 10:19

Thanks. I will use the grinder and skate system.