Hi everyone, first post after doing a fair bit of reading.
I have noted that the Drawings all follow a numbering sequence that is easy to understand. I also have established that if I sort the Drawings by process number I can outsource work lots and it is a nice way of logically managing the project.
What I would like to confirm is the Process Codes. Could someone point me to a forum post or comment on my best guess?
A - Assembly
T - Turning
W - Welding
D - Drilling
B - Bending
P - Profiling
S - Sawing
M - Milling
G - ??? Grinding (10 10 324 and 10 10 334)
K - ???? (M3 10 100)
C - Circuit
Thanks Craig
I have noted that the Drawings all follow a numbering sequence that is easy to understand. I also have established that if I sort the Drawings by process number I can outsource work lots and it is a nice way of logically managing the project.
What I would like to confirm is the Process Codes. Could someone point me to a forum post or comment on my best guess?
A - Assembly
T - Turning
W - Welding
D - Drilling
B - Bending
P - Profiling
S - Sawing
M - Milling
G - ??? Grinding (10 10 324 and 10 10 334)
K - ???? (M3 10 100)
C - Circuit
Thanks Craig