melissa
Fri 28 January 2011, 10:39
I just wanted to be sure about the order of drilling / welding the various bits on the spider (10 40 432).
- drill and tap six holes, M8 (10 40 432 D)
- use temporary bolts to hold nuts (10 40 432 W) and bearing supports (M1 20 220 T) in place on the spider
- weld the nuts and bearing supports
- remove temporary bolts and flatten the spider as necessary.
Does that all sound correct?
- drill and tap six holes, M8 (10 40 432 D)
- use temporary bolts to hold nuts (10 40 432 W) and bearing supports (M1 20 220 T) in place on the spider
- weld the nuts and bearing supports
- remove temporary bolts and flatten the spider as necessary.
Does that all sound correct?